CKY APEX — Nong Yai, Chonburi | EEC Zone

Worker Accommodation
560 Rooms. 10–14 Months.

Delivered with certainty. 7 Buildings × 4 Floors × 80 Rooms. Pile Cutting to Roof handover. Steel Deck MD-75 composite floor system. Galvalume AZ150 deep-rib roof. Thai Engineering License ภย 59410.

7
Buildings
560
Total Rooms
14M ★
Buffered Plan
฿109.2M
Contract Value
Your Project Status

CKY APEX — Live Progress

Schedule Index
Cost Index
Overall Complete
Status
Building Progress
Month —
Enter progress data in Live EVM below to update
Questions about this report?
Weerapong Wasukaratana | PE ภย 59410 | PMP #2874041
LINE @sugar_russ
Project Overview

One contract. Seven buildings. One engineering team.

Forma Corporations is the single-point engineering contractor for the complete CKY APEX worker accommodation complex — design-to-handover, ฿109.2M (฿15.6M/building), 12 months.

Thai Law Compliant
80 rooms/building per Thai Building Control Act. ใบอนุญาตนิติบุคคล ๓๕๐๒๖๗. All drawings certified ภย 59410.
Steel Deck MD-75 System
Composite floor deck eliminates formwork — 9-day floor cycle vs 14 days RC. ฿4.07M total advantage over conventional.
3 Parallel Crews
Crew A/B/C staggered 2 weeks — 7 buildings run simultaneously from M3. Peak 72 workers M5–M6.
China Interface Managed
Piling by China contractor upstream. Forma gates: piling ≥4W before Forma start per building. Contractual LD protection ฿50K/day.
Forma's Promise
"We sell certainty — not just construction."
Thai Engineering License
ภย 59410
Master Schedule

14 Months. 3 Crews. Accordion view.

Tap any building to expand 8-phase detail. Payment gates marked ◆. China piling upstream.

43
Weeks
15W
Per Building
3
Crews
72
Peak Workers
5
Payment Gates
2W
Float
Phases:
China
Foundation
RC Frame
Steel Deck
Roof
Envelope
Finishes
MEP
◆ Payment
📊 Gantt
💰 Payment Gates
🔴 Critical Path
Tap any building row to expand phase detail
Engineering

Structural certainty. Certified in-house.

All calculations certified by PE ภย 59410. ACI 318-19, AISC 360-22, วสท.1006-64 compliant.

Floor Plan
Structural Specs
Steel Deck vs RC
Floor Plan — 38,500 × 13,500mm | 20 rooms/floor (10 per side)
CORRIDOR — 1,500mm R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R20 38,500mm overall width 6,000 7,500
Room size: 3,500 × 6,000mm (Side A) / 3,500 × 7,500mm (Side B)
Floor plan: 20 rooms/floor × 4 floors = 80 rooms/building
Total: 7 buildings × 80 rooms = 560 rooms
Foundation
Grade beam 400×600mm, 4-φ20. Pile cap 800×800×400mm. RC40. 350kN working load.
Columns
300×300mm RC40. 8-φ20 vertical + φ6@150 ties. 4 floors typical — checked axial + biaxial bending.
Beams
250×500mm RC40. 5-φ25 bottom (max). T-beam composite with Steel Deck. Span 3.5m typical.
Steel Deck Floor
MD-75 deck + 75mm RC topping. φ12@300 mesh. 3.5m max span. Composite action with shear studs.
Roof Structure
Steel truss CHS 150×6 chord. Galvalume AZ150 deep-rib 0.47mm profile. 5° slope drainage.
Design Standards
ACI 318-19 RC. AISC 360-22 Steel. วสท.1006-64 Thai seismic. EC7 foundation. ISO 9223 corrosion.
Live Project Data

Earned Value Management — real-time.

BAC ฿109.2M | 14-month baseline incl. unforeseen buffer. SPI and CPI update as you adjust DNA factors above or use the EVM panel.

📈 S-Curve
⚡ Live EVM
14M Buffered — Clean Risk — Normal Cash
BAC = ฿109.2M | Thai Baht Millions
PV — Planned
EV — Earned
BAC ฿109.2M
SPI
CPI
EV (Earned)
EAC (Forecast)
EVM Metrics
฿0M
EV
฿0M
PV
SPI
CPI
฿—
EAC
฿—
VAC
Select month & enter progress →
Building Progress
Overall 0.0%
Reporting Month
⚡ Live EVM Control
Reporting Month
Actual Cost (AC) — ล้านบาท

Building % Complete

SPI
CPI
EV
EAC
Set month & progress
Awareness & Contingency

Risk management. Forma sees what others miss.

8 risks identified and mitigated. 5-layer cost contingency. China interface protocol defined.

Risk Matrix
Risk Register
Schedule Float
Cost Contingency
HIGH × HIGH
R01 China Piling Delay R05 Permit Delay
LOW × HIGH
R02 Steel Deck Late R04 Labor Shortage
HIGH × LOW
R03 Monsoon Weather R08 Material Price
LOW × LOW
R06 Scope Creep R07 Payment Delay
IDRiskPIScoreOwnerMitigation
Available Float
2 weeks
Risk Consumption
1–1.5 wk
Net Float
0.5–1 wk
⚠ Critical: China piling ≥4W before Forma start per building. Steel Deck ordered at LOI.
Range logic: ฿104M base + ฿5.2M contingency (5%) = ฿109.2M contract value. ฿15.6M per building fixed lump sum. Engineering + Permit included.
Investment

Transparent pricing. Certainty included.

All-in engineering and construction excl. VAT 7%. Pile cutting to roof handover. 12M realistic schedule.

Per Building
฿15.6M
Engineering + Permit incl.
Contract — Committed
฿109.2M
฿15.6M per building × 7
Total — 7 Buildings
฿109.2M
Excl. VAT 7%
Includes: Pile cutting → Foundation → GF slab → Structural frame → Steel Deck F2–F4 → Galvalume roof → Envelope → Finishes → MEP → PM+QA+Safety. Excl. VAT 7% (add ฿4.83M).
Our Team

Licensed. Experienced. Accountable.

WW
Weerapong Wasukaratana
Founder / CEO / PE
▸ ใบอนุญาตวิศวกร ภย 59410
▸ PMP #2874041
▸ LEED AP BD+C #11435934
20+ years. Samsung Engineering, PTT Excellence Award 2018. Founded Forma 9 years ago.
TN
Teeranai
PM / Site Operations
▸ Lead PM — CKY APEX
▸ China interface management
▸ Steel Deck procurement lead
On-site PM. 3-crew coordination. Weekly Work Plan owner.
GS
GreenSun
CM / QA Lead
▸ Construction Manager
▸ DuPont IIF on-site lead
▸ NCR & QC concrete/deck
Quality assurance. ITP owner. Zero LTI target.
KV
Kavita
BD — Eastern Region
▸ EEC / Chonburi specialist
▸ Client relationship lead
▸ Strategic partnership
Commission-based BD. Deep EEC industrial network.
SP
Supavinee
Site Coordinator
▸ Hiring plan coordination
▸ Progress report templates
▸ Permit submission support
Administrative backbone. Document control & filing.
PP
Pormpun
Coordinator
▸ BOQ document filing
▸ Client correspondence
▸ Payment tracking
Back-office support. Payment follow-up and correspondence.
Our Guarantee
Five layers of certainty.
Every commitment is contractual. Every risk is mitigated. Every baht is accountable.
14M
Schedule Commitment
LD clause ฿50K/day. Unforeseen buffer included.
5Y
Defect Liability
DLP 5 years post-handover. RC structural warranty.
฿109.2M
Fixed Price
฿15.6M per building. No surprise variations without VO.
IIF
Safety — Zero LTI
DuPont IIF protocol. Stop-work authority for all.
Ready to proceed?

Let's build certainty together.

Submit LOI or arrange a site walkthrough. Forma mobilises within 2 weeks of LOI signature.

ภย 59410
Engineering License
PMP #2874041
Project Management
LEED AP BD+C
Green Building
@sugar_russ
LINE Contact
LINE @sugar_russ → Call PM